⟨/⟩ AT Protocol Record Source
at://did:plc:o7x3aaueo7gbdj5s6ywwl7sl/site.standard.document/3moyap7jj6tz2
← Back to post
{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreicojsel3ogw6b3pner5ry4rchfvikf7kxvsbbuh3nrbqzoo46kg5e",
    "uri": "at://did:plc:o7x3aaueo7gbdj5s6ywwl7sl/app.bsky.feed.post/3moyap7jj5uz2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreiazgo432havq4x7ghzrteokpdozmmach2riu2xfwo6njca7i5nkrq"
    },
    "mimeType": "image/jpeg",
    "size": 65684
  },
  "path": "/abrasilver-pegs-diablillos-npv-at-4-8-billion-in-definitive-feasibility-study/?utm_source=rss&utm_medium=rss&utm_campaign=abrasilver-pegs-diablillos-npv-at-4-8-billion-in-definitive-feasibility-study",
  "publishedAt": "2026-06-23T12:51:51.000Z",
  "site": "https://thedeepdive.ca",
  "tags": [
    "Latest",
    "Resources",
    "AbraSilver Resource Corp",
    "AbraSilver Pegs Diablillos NPV at $4.8 Billion in Definitive Feasibility Study",
    "the deep dive"
  ],
  "textContent": "AbraSilver Resource Corp (TSX: ABRA) has unveiled a definitive feasibility study for its Diablillos silver-gold project, framing the asset as one of the more compelling undeveloped precious metals stories in the sector. The study assigns Diablillos an after-tax net present value of US$3.0 billion, or CAD$4.2 billion at a 5% discount rate, alongside a 41.9% […]\n\nThe post AbraSilver Pegs Diablillos NPV at $4.8 Billion in Definitive Feasibility Study appeared first on the deep dive.",
  "title": "AbraSilver Pegs Diablillos NPV at $4.8 Billion in Definitive Feasibility Study"
}